The operation of securing the well and then unlatching of the riser connector to separate the riser and LMRP from the BOP stack.
Emergency Disconnect System (EDS)
•
« Back to Glossary Index
•
•
The operation of securing the well and then unlatching of the riser connector to separate the riser and LMRP from the BOP stack.
•